top of page
CPM Pipelines

CPM Pipelines

Writer
More actions

Profile

Join date: Mar 25, 2025

Posts (15)

Jun 11, 20263 min
Extending the Life of Critical Infrastructure: BulletLiner® Rehabilitation of Cleveland Water’s St. Clair 24-Inch Water Main
Aging water infrastructure presents a growing challenge for utilities across North America. When critical pipelines reach the end of their service life, utilities must balance reliability, cost, and community impact while selecting the most effective rehabilitation solution. That was the challenge facing Cleveland Water along St. Clair Avenue NE in Cleveland, Ohio, where a 385-foot segment of a 24-inch steel water main required rehabilitation to ensure continued service reliability. The...

3
0
May 13, 20261 min
Potomac River Transmission Main Break Highlights the Cost of Delayed Infrastructure Renewal
A major sewer pipe collapse near the Potomac River renewed concerns about aging infrastructure and delayed pipeline rehabilitation projects. According to DC Water, approximately 243 million gallons of wastewater overflowed into the Potomac River after a pipeline collapsed on January 19, 2026 in Montgomery County, Maryland, roughly eight miles from the White House. Most of the overflow occurred during the first five days before emergency bypass pumping systems were activated. Repair efforts...

10
0
Apr 7, 20262 min
Emergency Pipeline Rehabilitation: How Trenchless Technology Saved a Critical Arizona Water Main
When a critical water transmission main fails, especially in a highly constrained environment, the margin for error is slim and the need for rapid response is paramount. A recent emergency project in southern Arizona demonstrates how advanced trenchless solutions can restore infrastructure quickly, safely, and with minimal disruption—even under some of the most challenging conditions. The situation began with a 16-inch ductile iron water transmission main that had been in continuous service...

5
0
bottom of page